What the scheme pays

System sizeSubsidyNote
Up to 1 kW₹30,00060% of benchmark cost for the first 2 kW
2 kW₹60,000Residential connections only
3 kW and above₹78,000Capped — no additional central CFA beyond 3 kW

Targets 1 crore installations by FY 2027 with an outlay of ₹75,000 crore. Eligibility is generally 1–10 kW per household, through an MNRE-empanelled vendor using ALMM-listed modules. Battery storage is not covered.

Where it helps — and where it does not

Benefits

  • Direct subsidy up to ₹78,000 reduces upfront cost substantially
  • Free electricity for the first 300 units a month for typical homes — delivered through generation, not a waiver
  • Net metering values each exported unit at the applicable tariff
  • Bank loans at about 7–9% make the net cost payable by EMI
  • A 3 kW system avoids roughly four tonnes of CO₂ a year

Limitations

  • Residential only — commercial and industrial connections are excluded
  • Installation must be through an MNRE-empanelled vendor
  • ALMM-listed modules are mandatory
  • Battery storage is not covered
  • DISCOM feasibility and subsidy timelines vary by state
  • One claim per electricity connection, with ownership proof or NOC

The seven-step application process

STEP 01

Consumer registration

Register on the National Portal for Rooftop Solar with mobile number, Aadhaar and electricity bill details.

STEP 02

Vendor selection

Choose an MNRE-empanelled vendor; the vendor conducts the site survey and prepares the technical proposal.

STEP 03

Feasibility application

The vendor submits the feasibility application to the DISCOM with a single-line diagram and structural assessment.

STEP 04

DISCOM approval

Electrical feasibility, transformer capacity and sanctioned load are verified — typically 15–30 days.

STEP 05

Installation & commissioning

Installation using ALMM-listed modules and MNRE-empanelled inverters, then the commissioning certificate is uploaded.

STEP 06

Net metering & inspection

The DISCOM installs the bidirectional meter and inspects the installation.

STEP 07

Subsidy disbursement

Subsidy is credited to your registered bank account, usually 15–30 days after inspection.

Typical timeline: 60–120 days from application to commissioning, with Delhi NCR DISCOMs often completing in 60–90 days. Subsidy reaches your bank account usually 15–30 days after inspection.

Technical requirements

Eligible size1–10 kW (subsidy on the first 10 kW only)
ModulesALMM-listed, IEC 61215 / IEC 61730 certified
InverterMNRE-empanelled; IEC 62109 and anti-islanding per IEC 62116
MeteringNet metering with a bidirectional meter per state SERC
Roof load capacityAt least 15 kg/m², verified by structural assessment
Sanctioned loadSolar capacity normally cannot exceed sanctioned load
Annual generation1,300–1,500 kWh per kWp; Delhi NCR at the upper end
Performance ratio≥ 78% for a well-designed system
WarrantyModule 25 years; inverter 5–10 years (as per manufacturer)

Typical bank financing

AmountBankRateTenure
State Bank of IndiaUp to ₹6 lakh8–9% p.a.Up to 10 years
Canara BankUp to ₹5 lakh8–9% p.a.Up to 10 years
Punjab National BankUp to ₹5 lakh8.5–9.5% p.a.Up to 10 years
Bank of BarodaUp to ₹5 lakh8–9% p.a.Up to 10 years
Indian BankUp to ₹5 lakh8.5–9% p.a.Up to 10 years

Indicative only. Banks decide eligibility, rate and tenure — confirm the latest terms with your branch, and use the EMI calculator to model the instalment.

Ten mistakes that delay or disqualify applications

MistakeCorrect approach
Applying without confirming vendor empanelmentVerify vendor status on the National Portal before signing
Choosing non-ALMM modulesInsist on ALMM verification and serial-number documentation
Oversizing beyond sanctioned loadCheck the sanctioned load on your latest bill before sizing
Skipping DISCOM feasibilityFollow the portal sequence; never install before approval
Mismatched bank account nameKeep portal name, bank account and electricity bill identical
Picking the cheapest vendor without service checksEvaluate track record, warranty terms and after-sales presence
Expecting battery backup from the schemeBudget separately for storage if backup is required
Misreading the 300 free units claimIt means offset through generation, not a DISCOM waiver
Waiting for a higher subsidyApply when your roof and finances are ready
Ignoring maintenanceSign an AMC with a written scope for ongoing O&M

Documents to keep ready

  • Latest electricity bill with sanctioned load and connection name
  • Aadhaar and a photo ID
  • Bank account details and a cancelled cheque — the name must match the connection
  • Ownership proof, or the owner's NOC if you are a tenant
  • RWA NOC for roof use and cable routing in a society

Standards and regulations

  • MNRE PM Surya Ghar Muft Bijli Yojana Guidelines 2024
  • ALMM list — mandatory for subsidised modules
  • IEC 61215 / IEC 61730 — module certification
  • IEC 62109 / IEC 62116 — inverter safety and anti-islanding
  • CEA Connectivity Regulations 2019 · state SERC net-metering regulations
  • BIS certification for components · IS 3043 earthing

How SRG handles this for you

  • Portal registration and vendor documentation
  • DISCOM feasibility application with single-line diagram
  • Installation using ALMM-listed modules and empanelled inverters
  • Net-metering coordination and inspection follow-up
  • Subsidy disbursement follow-up until the credit lands

We do not guarantee approval — the DISCOM decides feasibility, and the portal decides disbursement. We do guarantee that we chase it.

Start my subsidy application

Go deeper

Source material: manufacturer-published guidance, reproduced with our own commentary.

New to a term? The solar glossary explains kWp, net metering, ALMM, VNM, CAPEX and 33 more in plain language.

Want us to check your eligibility properly?

Send your bill details and district. We will confirm the subsidy tier, the feasible system size and what the DISCOM will approve — free.

Call WhatsApp Free quote