Subsidy calculator
What subsidy will you actually get?By state and by kW.
Central assistance is the same everywhere. Several states add a top-up on top of it — Uttar Pradesh adds ₹15,000 per kW. Pick your state and size to see the full stack.
Indicative. Amounts, slabs and eligibility follow current government rules and can change — verify on the National Portal and your state agency before you buy.
01Your system
Estimate your subsidy
Nothing is stored. Subsidy is credited to your bank account after the system is commissioned and inspected — it is not a discount at the counter.
Choose your state and size, then calculate.
02Central assistance
Same in every state
PM Surya Ghar central financial assistance for residential rooftop solar.
| System size | Central subsidy | How it is calculated |
|---|---|---|
| 1 kW | ₹30,000 | ₹30,000 for the first kW |
| 2 kW | ₹60,000 | ₹30,000 per kW for the first two |
| 3 kW | ₹78,000 | ₹60,000 + ₹18,000 for the third kW |
| 4 kW and above | ₹78,000 | Capped — no further central assistance beyond 3 kW |
Residential rooftop connections only. Paid by direct bank transfer after commissioning and inspection.
03State top-ups
What your state adds
Top-ups are set by state agencies, differ by state, and are usually paid on top of the central amount for the same eligible system.
| State | At 1 kW | At 2 kW | At 3 kW | Status |
|---|---|---|---|---|
| Assam | ₹15,000 | ₹30,000 | ₹45,000 | Added to total |
| Chhattisgarh | ₹15,000 | ₹30,000 | ₹30,000 | Added to total |
| Delhi | ₹26,000 | ₹52,000 | ₹78,000 | Added to total |
| Haryana | ₹10,000 | ₹20,000 | ₹20,000 | Added to total |
| Jammu & Kashmir | ₹3,000 | ₹6,000 | ₹9,000 | Added to total |
| Ladakh | ₹20,000 | ₹40,000 | ₹50,000 | Added to total |
| Odisha | ₹25,000 | ₹50,000 | ₹60,000 | Added to total |
| Tamil Nadu | ₹5,000 | ₹10,000 | ₹22,000 | Added to total |
| Uttar Pradesh | ₹15,000 | ₹30,000 | ₹30,000 | Added to total |
| Bihar | ₹10,000 | ₹20,000 | ₹20,000 | Possible, not added |
| Gujarat | ₹10,000 | ₹20,000 | ₹20,000 | Sources conflict, not added |
| Jharkhand | ₹15,000 | ₹30,000 | ₹45,000 | Possible, not added |
| Puducherry | ₹10,000 | ₹20,000 | ₹30,000 | Sources conflict, not added |
| Telangana | ₹10,000 | ₹20,000 | ₹30,000 | Possible, not added |
| Uttarakhand | ₹17,000 | ₹34,000 | ₹51,000 | Sources conflict, not added |
| Goa | See state notice | See note | Calculated by hand | |
States not listed have no state top-up in our rules file, so only the central amount applies. Only rows marked "Added to total" are counted in the estimate. Figures are as of 2026-10-15. Verify each figure with the state agency and the National Portal before purchase.
04Uttar Pradesh, worked out
₹1,08,000 on a 3 kW system
Our home state stacks the central and state amounts. On residential rooftop systems both are paid after commissioning, so plan the cash flow for the interim.
- 3 kW — central ₹78,000 plus UPNEDA ₹30,000, about ₹1,08,000 in total
- 1 kW — ₹30,000 central plus ₹15,000, about ₹45,000
- Beyond 3 kW both components stop — a 5 kW system still receives ₹1,08,000
Figures as published for Uttar Pradesh. Verify current slabs on the National Portal and upneda.org.in.
What decides eligibility
- Residential connection with a net meter
- ALMM-listed modules, MNRE-empanelled installer
- Application filed on the National Portal
- Commissioning and inspection completed first
Commercial and industrial systems are outside PM Surya Ghar — accelerated depreciation and GST input credit are the levers there.
05Questions
Subsidy questions
If your question is not here, the assistant or our team will answer it — usually the same working day.
As a guide, a 3–5 kW home system runs about ₹1.5–3 lakh before subsidy. We send an itemised quotation after a site survey, with subsidy, net cost and assumptions shown. Fixed prices are not published because roof, consumption and components decide them.
Yes. We prepare DISCOM applications, coordinate net-meter installation and support PM Surya Ghar filing where you are eligible. Approval timelines rest with the DISCOM, and we keep you updated at each stage.
Physical installation often takes 2–5 days once materials are ready. Net-meter approval depends on your DISCOM and typically takes a few weeks; the full application-to-commissioning cycle is usually 60–120 days, and 60–90 days is common in Delhi NCR.
The full store catalogue is mirrored in our shop section — every listing with its published price, specification and variants. Compare and shortlist here, then order on the store, which delivers across India. Distributors can ask us for programme pricing and bill-of-materials support.