>

Vocabulary

Plain words.No jargon wall.

This page keeps our vocabulary in plain language, so a quotation, a DISCOM form or a subsidy portal never leaves you guessing.

38 terms across solar, storage, grid rules, subsidy and mobility.

01

Solar & system terms

12 terms

kW and kWp

kW is the capacity of the system; kWp is that capacity measured under standard test conditions (1,000 W/m² at 25 °C). A 5 kW and a 5 kWp system are the same thing in everyday conversation — quotations are usually written in kW.

Unit (kWh)

One unit on your bill is one kilowatt-hour — 1,000 watts consumed or generated for one hour. A 5 kW rooftop system in North India typically generates 19–23 units a day.

On-grid / grid-tied

A system that works with the DISCOM supply and exports surplus generation to the grid under net metering. No battery back-up: during a power cut, an on-grid inverter shuts down for safety (anti-islanding).

Off-grid

A system with battery storage and no grid connection — used where the supply is absent or unreliable, such as farms, telecom sites and remote facilities.

Hybrid

An on-grid system with battery storage. It exports surplus when the grid is available and switches to stored power during a cut, typically covering 4–8 hours of essential loads.

Inverter (string vs micro)

The inverter converts DC from the modules into usable AC. A string inverter serves a whole array; micro-inverters sit under individual modules and help on shaded or multi-direction roofs at a higher cost per kW.

MPPT

Maximum Power Point Tracking — the inverter's continuous search for the voltage and current at which the array yields the most power. More MPPT channels help when parts of the roof face different directions.

Bifacial and TOPCon modules

Bifacial modules also collect light reflected onto their rear face; TOPCon is a cell technology with better performance in heat and low light. Both are mainstream options, and both must be ALMM-listed to qualify for subsidy.

String, array and BOS

Modules wired in series form a string; strings together form an array. BOS (balance of system) covers everything that is not a module or inverter — mounting structure, DC and AC cabling, earthing, surge protection, meters.

Tilt and azimuth

Tilt is the angle of the modules from horizontal; azimuth is the compass direction they face. In North India, a south-facing installation at roughly 15–25° tilt is the usual optimum.

Shadow-free area

The roof area that stays clear of shadow through the day, all year. As a working guide, allow about 80–100 sq ft per kW including walkways and servicing gaps.

Degradation

The slow decline in module output with age — about 0.5–0.7% a year for mainstream products. It is why a 25-year savings forecast is not simply first-year savings × 25.

02

Storage & backup

5 terms

Lithium (LFP) battery

The chemistry used in almost all current solar storage — lithium iron phosphate. Long cycle life, no maintenance, and safe at Indian ambient temperatures when correctly installed and ventilated.

DoD (depth of discharge)

How much of the battery's capacity you actually use before recharging. Quoted usable capacity assumes a DoD, so compare batteries on usable kWh, not on nameplate kWh alone.

C-rate

How fast a battery can charge or discharge relative to its size. A 1C battery discharges fully in one hour; home storage is usually specified well below 1C.

Cycle life

The number of full charge–discharge cycles a battery is rated for before its capacity falls to a stated percentage. Multiply cycles by usable kWh to compare two batteries fairly.

Battery back-up is not subsidised

Under PM Surya Ghar, central financial assistance applies to the solar system, not to battery storage. Budget for storage separately.

03

Grid, metering & regulation

9 terms

DISCOM

The distribution company that supplies your electricity and processes your solar application — PVVNL in Ghaziabad, Gautam Budh Nagar and Bulandshahr, and BSES or Tata Power DDL in Delhi.

Sanctioned load

The load your connection is permitted to draw, shown on your bill. It usually caps the rooftop system you may install — commonly 100% of sanctioned load for residential and lower percentages for commercial connections.

Net metering

A metering arrangement where exported units are set against imported units, and you are billed on the net figure. Best economics where you consume most generation yourself and export the balance.

Net billing / gross metering

Alternatives to net metering: generation is bought at a feed-in rate instead of being netted off. The rate is usually lower than your retail tariff, so the numbers change materially.

Bi-directional meter

The DISCOM meter that records both import and export. It is installed or reconfigured by the DISCOM as part of net-metering commissioning.

Virtual net metering (VNM)

One plant on a shared or common roof, such as a society clubhouse, generating credits that are shared across several consumer meters. Credits are normally split by flat size, sanctioned load or an equal share.

Group captive and open access

Structures that let a company buy power from a generating asset it partly owns or contracts with, using the transmission or distribution network, under the regulations of the relevant State Electricity Regulatory Commission.

Feasibility approval

The DISCOM's technical clearance that your roof, sanctioned load and local network can accept the proposed system. Install before approval and you risk losing subsidy and net metering.

PPA, CAPEX, DPA, lease

Ways to pay for a system. CAPEX is outright purchase; a PPA sells you units at an agreed rate with no upfront cost; DPA or a loan spreads the cost as EMI; a lease rents the asset. Compare them on total 25-year outflow, not on the monthly figure alone.

04

Subsidy & certification

8 terms

PM Surya Ghar: Muft Bijli Yojana

The Government of India residential rooftop scheme launched in February 2024, providing central financial assistance and, with net metering, targeting free electricity for the first 300 units a month.

CFA (central financial assistance)

The subsidy itself: ₹30,000 per kW for the first 2 kW and ₹18,000 for the 3rd kW, capped at ₹78,000 for residential systems of 3 kW and above, up to 10 kW.

ALMM list

The Approved List of Models and Manufacturers maintained by MNRE. Modules installed under subsidy schemes must appear on it — ask for model numbers and serial numbers in writing.

MNRE-empanelled vendor

A vendor registered on the national portal to install subsidy-linked systems and file the claim. Only an empanelled installer can route the subsidy.

DREBP and PM KUSUM

Two other schemes in the same family — distributed renewable energy for livelihoods, and PM KUSUM for agriculture, including solar pumps and feeder solarisation.

Accelerated depreciation

A tax benefit for businesses: up to 40% depreciation on eligible solar assets in the first year, which improves post-tax payback on commercial projects.

IEC and BIS standards

IEC 61215 and 61730 cover module design and safety; IEC 62109 and 62116 cover inverter safety and anti-islanding; BIS applies to electrical components and IS 3043 to earthing. These are the certificates to ask for, not the brochures.

Cross-subsidy surcharge

A charge levied on open-access consumers who leave the DISCOM pool. Its size often decides whether a large industrial open-access project works.

05

Wind, pumping & mobility

4 terms

Small wind turbine

Rooftop or small-ground turbines from about 1 kW upward, usually hybridised with solar because wind and sun peak at different times of day and year.

Hybrid wind-solar

A single controller manages both sources into one load and storage bank, improving year-round availability over either source alone.

Solar pump

A photovoltaic array driving an AC or DC pump through a controller, sized on head and daily water requirement. Removes diesel cost for irrigation and is often supported under PM KUSUM.

AC and DC EV charging

AC chargers (3.3 kW to 22 kW) suit homes, offices and overnight fleets; DC chargers from 30 kW to 360 kW suit highway, retail and fleet turnaround use. Connector types must match the vehicles you expect.

Which term is holding you up?

Send the question with your bill or quotation and we will translate it into plain numbers.

Submitted to SRG's secure server; a minimal follow-up copy may go to an operator-configured service. Retained up to 24 months. Keep your reference to request deletion on the privacy page.

Thank you — your reference is

Our team responds within 48 hours. Keep this reference; use the privacy page with the same mobile number to request deletion.

01Questions

Glossary questions

If your question is not here, the assistant or our team will answer it — usually the same working day.

Call +91 92208 88045

No — but they are the words you will meet in a quotation, a subsidy form and a DISCOM reply. Knowing six of them is usually enough to ask the right question at the right moment.

Sanctioned load, net metering treatment, ALMM compliance and the payment structure (CAPEX, loan, PPA). Those four move the number more than any equipment specification.

On the primary sources: the national portal for Rooftop Solar for scheme rules, your own bill for sanctioned load and slab structure, and the DISCOM or UPNEDA for net metering. We link instead of paraphrasing wherever a link exists.

Read one page, argue with any installer.

That is the whole purpose of this page. If a quotation uses a term we have not listed, ask us to add it.

Call WhatsApp Free quote